G's Vzr N1

getting there got most things bolted on, enough for a test drive :)

repair-012.jpg



repair-013.jpg



repair-014.jpg



repair-015.jpg



repair-016.jpg



repair-017.jpg




need to get wheel alignment sorted now, downpipe and front passenger side brakes binding...:(
 
wheel alignment sorted yesterday, gave it a wash and quick polish...

and stuck some the new wheels on, freshly painted tango!!!!!


repair-018.jpg



repair-019.jpg



repair-020.jpg



repair-021.jpg



repair-022.jpg




we are back on the road, and ready to roll woohooo....


job for next summer or if get a good long weekend is to swap over the rear hatch with the spare better condition one I have
 
wheels I have got them Plasti Dipped, wasn't sure what orange would look like so that was the best way to try it out
 
Motor is looking so sweet G, when you popping down to get the front bumper mopped now it's all fitted & looking the part?


Sent from my  iPhone® using Tapatalk
 
The boot door is getting rusty is it? Be better to nip that in the bud now! prob be a window out job tho would it?
 
The boot door is getting rusty is it? Be better to nip that in the bud now! prob be a window out job tho would it?

have that covered as mentioned in my earlier post, I have a spare, called it the rear hatch instead of boot, that'd confuse ya :)
 
Motor is looking so sweet G, when you popping down to get the front bumper mopped now it's all fitted & looking the part?


Sent from my  iPhone® using Tapatalk


depends if I get a decent price for the downpipe from that guy in Kent, in which case will do both the same day...
 
Back
Top Bottom