Thanks,
heres the pics from the garage
total bill for it is 1050 cash
inc my MOT which runs out on monday
the bill is for;
removing the engine and putting it back in, stripping it fully, boring the block +0.5mm, slight head skim, clean and acid dip all nessesary parts, paint block, lighten the crank (was prevoiusly lightened on my last build last year) and balanced the (L-R) crank pully, crank, flywheel and clutch ie the crank assembly so the whole bottom end it balanced sweet as, race bearings on the crank-rods, lightening the rods some more too, and replacing every part with new stuff which i had bought previously,
you can see slightly on the rods H beam section where they have shaved some metal off to lighten them, where they go from a round edge near the top by the piston and becomes a flatter surface
hear the head not cleaned yet but you can see where they have edged off the valve seats and some polishing
some of the inlet porting and polishing
and my crank,
see where they have taken some of the metal surface and drills some holes all smoooooth
to get all this done inc porting and polishing the head inc ALL parts and not boring the pistons they charge £1680 cash
which is what i paid last year when i had it done that inc lightening the flywheel too, removing and instslling the engine also,
all that lightening got me 144lbft of torque so it def made some improvements,
cant wait to get it back