G's Vzr N1

getting there got most things bolted on, enough for a test drive :)

repair-012.jpg



repair-013.jpg



repair-014.jpg



repair-015.jpg



repair-016.jpg



repair-017.jpg




need to get wheel alignment sorted now, downpipe and front passenger side brakes binding...:(
 
wheel alignment sorted yesterday, gave it a wash and quick polish...

and stuck some the new wheels on, freshly painted tango!!!!!


repair-018.jpg



repair-019.jpg



repair-020.jpg



repair-021.jpg



repair-022.jpg




we are back on the road, and ready to roll woohooo....


job for next summer or if get a good long weekend is to swap over the rear hatch with the spare better condition one I have
 
Motor is looking so sweet G, when you popping down to get the front bumper mopped now it's all fitted & looking the part?


Sent from my  iPhone® using Tapatalk
 
The boot door is getting rusty is it? Be better to nip that in the bud now! prob be a window out job tho would it?

have that covered as mentioned in my earlier post, I have a spare, called it the rear hatch instead of boot, that'd confuse ya :)
 
Motor is looking so sweet G, when you popping down to get the front bumper mopped now it's all fitted & looking the part?


Sent from my  iPhone® using Tapatalk


depends if I get a decent price for the downpipe from that guy in Kent, in which case will do both the same day...
 
Back
Top Bottom