Thought I'd give a wee update. Season is finished and I won my class, 2nd in the newcomers and 9th overall in the highland speed championship. Had I entered the Scottish sprint championship I would have won my class in there too with my results.
The shopping list is shrinking too but so is the wallet
Already collecting bits for the winter rebuild. Plans are as follows
Gearbox
4.785 Mfactory FD Purchased - to be fitted
Cusco MZ 1.5way diff Purchased - to be fitted
Fidanza Flywheel Purchased - to be fitted
Engine parts in possession
Janspeed head
C3 Cams
Eagle rods
GtiR oil squirters
BC Springs
Engine shopping list
1mm oversized valves
titanium retainers
C6m cams and solid lifters (if theres enough left in the pot)
Bearings, seals and gaskets
VE oil pump
4cw crank (sourced) which needs lightened and balanced
ECU (looking like DTA S40 or 60)
Was hoping to have enough left over for a set of jenveys but I doubt it so probably have to settle for some bigger injectors for now.
Body
General tidy up, few bits need touching up Trying to convince the local college to use it as a project car for their bodywork classes
GRP wings to paint and fit Purchased - to be fitted
GRP Diffuser to fit Purchased - to be fitted
If time/money allows cut out the boot floor, remove fuel tank and fit a small tank and swirl pot. (unlikely to get done to be honest)
Rapidly shrinking budget is going to lead to a compromised engine spec for the next couple of years I think. I don't want to half arse something with the janspeed head, it needs to be done properly so I think I am going to stick with the current head and c3 cams for now. I have a set of 16ve pistons that will bump the compression up, I have eagle rods and a set of lightened stock rods, not sure which way I'm going to go yet. 4cw crank courtesy of Sam to be lightened and balanced, ve oil pump and new bearings, seals, water pump.
Should be enough left in the pot for some jenveys now. Still undecided on which ecu to go for, probably depend on the finances when it gets to that stage.
Managed to bag some willwood callipers and carriers so need to source some discs and ds2500 pads for them.
Also managed to source one of the 12 heated windscreens that were made to order for Tony Bardy and the gtiroc. Massive improvement on my shite kit car blower which will be getting discarded rather rapidly.
So to summarize:
- Rebuild Spare Gearbox
- Build up spare Block
- Remove engine, box and wiring from car
- Remove windscreen
- Remove front Wings
- Remove windows
- Try and convince someone to paint it for a ham sandwich and packet of crisps
- Remove head from current engine
- Put new engine together and fit to car
- Fit rebuilt gearbox
- Put all the windows back in and wire in new heated screen
- Refit any panels that were removed for painting
- Make up new minimalist loom for ECU
- Throw on the Jenveys that I haven't bought yet
- Give it to someone with more know how than me to get it all running the way it should.
Thats not including all the small jobs I want to do like making up tail light and headlight blanks, making up an airbox for the jenveys, installing small fuel tank, making up a flat boot floor, fitting diffuser etc etc etc etc
Going to be a busy winter.....