due to other things taking up time today we didn't get that much done, but what me and nick :lol: got done will help us just crack on with trial fitting the ve tomorrow.
first up we had to pull the gearbox for two reasons, first was to convert it from cable to hydraulic operated clutch, and secondly to fit the new exedy clutch kit (thanks again will :shades: )
swapping to hydraulic clutch was very straightforward thanks to the N1 clutch lever supplied by dylan (thanks again mate :shades: ), so cable actuator arm off, hydraulic actuator arm back on, along with the new release bearing and a re-grease
gearbox off
clutch levers and relese bearing forks, hydraulic lever on the far left
exedy clutch kit
hydraulic lever and new release bearing back on
clutch and cover plate on
i trial fitted the clutch secondary cylinder off of the N16 to the box and it mates up perfectly with the N1 lever, i was so pleased as this along with the mounting points is one of the areas i was concerned about. we also pulled the plugs out and lifted off the rocker cover to inspect the general health of the top end and to see how it's been running, and as you can see it's looks very good indeed
NGK bkr6e's in well good nick
and where this engine shines, lobeville :lol:
we also took off the stock VE manifold and fitted the header off my toyosport ebay jobbie, i forgot to take a pic of the new manifold on the engine so i'll get some tomorrow but look at the length of the primaries on the VE's stock header!
also i found out that the P11 gearbox mount works perfectly on the rs5f32v box and mates exactly to the N16 mounting place :shades:. well that's all for today, more to follow tomorrow