ok well it looks like my camera has taken its own life so verbal updates only for now. so now I'm ok financially again phase 2 of this project is now in motion, firstly we pulled the rear axle off Stevens old n16 as it has a disc rear brake setup and mine is currently drums, that is in the process of being de-rusted and hammerited, and having the poly bushes fitted along with an adjustable sr link. the calipers are being fully rebuilt and then put back in place with primera carriers and 279mm rear discs. I have new front bottom arms en route and they will receive the hammerite and poly bush treatment too.
for the suspension i had bought a set if daiyama coilies but I think I'm going to sell them on and get a set of meisters instead.
then I will get some brackets made up for my sumitomo 4 pots (which are also being refurbed) along with redrilled discs either 296 or 310mm for the front brakes, that will finish up the suspension and brakes.
I also have bought a 20ve block from Dylan, along with 2l rods, crank, crank girdle, ve oil pump. this will be sent away for cleaning, pressure testing and boring out to suit 88mm pistons, this will be put back together with acl bearings and uprated rod bolts, and a 4cw crank thats coming from rick, the pistons/cr will be decided on once I get some info regarding the suitability of almerasleeper/pauls supercharger for my expected power output, as I can't decide until I know if I'm going forced induction or NA.
the head will receive a mild port and Polish, uprated springs and retainers and the n1 cams we have sitting.
the exhaust will most likely be a b18 tri-y manifold modified to fit the ve with a mazworks ve exhaust flange, joined to a custom Billy 2 3/4" or 3" catback.
that's about it for now, I'll update more when I get a new camera and as the work progresses, it should all be finished up by April next year, then I can start on my assault of ed's cracking n16 1/4 mile time :shades:
... --- ...